Grounding Test Report

Project Information

form id= "frm-swbd-proj-info"

Name Plate Data

form id= "frm-mv-swbd-nameplate"

Rated Voltage of windings Windings Bushings
Insulation Class Bil Insulation Class Bil
480V 1.2KV 10KV 1.2KV 10KV
4160V 5KV 30KV 5KV 30KV
13.8KV 15KV 95KV 15KV 95KV
34.5KV 34,500V 150KV 34,500V 150KV

Project Information

form id= "frm-swbd-proj-info"

Name Plate Data

form id= "frm-mv-swbd-nameplate"

Visual and Mechanical Inspection

Basic form layout

Bus Resistance Test

id= "frm-mv-swbd-bus-res"

NETA ATS 7.2.2: Measure the resistance of each high-voltage winding in each de-energized tap-changer position. Measure the resistance of each low-voltage winding in each de-energized tapchanger position

Insulation Resistance Test

id= "frm-mv-dry-ins"

NETA ATS: Perform insulation-resistance tests winding-to-winding and each winding-to-ground. Apply voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.5. Calculate polarization index.

Neta Table 100.5