Circuit Breaker Test Sheet

Project Information

form id= "frm-swbd-proj-info"

Name Plate Data new

form id= "frm-lv-cb-nameplate"

SETTINGS

Basic form layout

As Found

As Left

Visual and Mechanical Inspection

Basic form layout

TEST DATA

Protective Functions

Ground Fault Protection:

Contact Resistance Test

Measurement should be taken across open contacts (line-load)

NETA ATS: Microhm or dc millivolt drop values shall not exceed the high levels of the normal range as indicated in the manufacturer’s published data. If manufacturer’s published data is not available, investigate values that deviate from adjacent poles or similar breakers by more than 50 percent of the lowest value.

Insulation Resistance Test

NETA ATS: Perform insulation-resistance tests for one minute on each pole, phase-to-phase, phase-to-ground, and phase-to-Neutral with the circuit breaker closed, and across each open pole. Apply voltage in accordance with manufacturer’s published data. In the absence of manufacturer’s published data, use Table 100.1.

Neta Table 100.5